Research Article

AN ASSESSMENT OF CRITICAL FACTORS INFLUENCING PRODUCTIVITY OF CRAFTSMEN ON CONSTRUCTION SITES IN KADUNA METROPOLIS.

1 Department of Building Kaduna State University, Kaduna
2 Department of Quantity Surveying Kaduna State University, Kaduna
* Corresponding author: yahyaa@kesj.org.ng
Published: Dec, 2020
Pages: 38-48
Views: 35
Downloads: 15

Abstract

Productivity at both micro and macroeconomic level is a serious issue as far as the industrialsector is concerned and construction industry is one of such industries that make very higheconomic contributions in every nation. Consequently, productivity of labour is particularlyimportant especially in developing countries where most of the building construction work is stillon manual basis. This research assesses the critical factors influencing productivity of craftsmenon construction sites in Kaduna Metropolis with a view to; identify factors influencing productivityof craftsmen on construction sites, to measure the level of influence of these factors on labourproductivity, and to establish tools for improving labour productivity of craftsmen on constructionsite. It was carried out by means of literature review and field survey entailing the use of a wellstructuredquestionnaire. and descriptive analysis was employed .A total of seventy-eight (78)questionnaires were distributed with sixty-three (63) returned well filled giving a percentageresponse of 80.77%. The result of the analysis revealed that; the three most significant workerfactorsthat affect productivity are worker expertise, worker capability and worker morale andattitude, the most significant materials/tools related factors are material conditions, materialapplicability and material quantity, the most significant work characteristics related factors arework space, working field accessibility and work environment and the most significantManagement and control related factors are management capability, drawing and specificationalteration during execution and payment delay. Thus, the paper concluded that Construction sitesin Kaduna Metropolis are faced by poor productivity of craftsmen leading to construction ofsubstandard structure and abandonment of projects, in turn the following are recommended; theemployment of workers with high skills and expertise should be adhered, motivation and trainingof workers should be encouraged as a vital tool in productivity improvement and capability andexperience of craftsmen should be looked into before allocating a task to them.

References

  1. Abdel-Razek, R., Abd Elshakour, H. and Abdel-Hamid, A. (2006), Labour productivity: benchmarking and variability in Egyptian projects. International Journal of Project Management, 25: 189-197.
  2. Abdullahi, M. (2009). Determination of Labour Output for the Nigeria Construction: a case study of the Kaduna construction Labour Market, unpublished (BSc.) thesis. Department of Quantity Surveying, Ahmadu Bello University, Zaria.
  3. Adnan, E. Sheriff. M. Zaid, A.M., and Peter, E.M. (2007). Factors Affecting Labour Productivity In Building Projects In The Gaza Strip. Journal of Civil Engineering and Management, 13(4). 244-246.
  4. Alfred L E :( 1988) Construction Productivity, Book Company, New York
  5. Amusu I (2000) Theoretical Training for Engineering Personnel. 10th Engineering Assembly, Abuja Nigeria.
  6. Andesons S P, Wood head RW: (1981) Project Manpower. John Wiley & Sons.
  7. Arboleda, A.C. and Abraham, D. M (2002). Fatalities in Trenching Operations-analysis of Models Accident in Construction. United States of America.
  8. Ark, B.V and Ypma, G. (2006). Employment and Hours Worked in National Accounts, available at: www.euklems.net (accessed 22 January, 2011)
  9. Austen A.D :( 1994) Managing Construction Project. I.L.O Production, Geneva.
  10. Awe M.E (2006). Strategies for Functional Technical Education and Training of Skilled Craftsmen. The Builders Focus pp 33 NAOBS.
  11. Bamisile A. (2004). Building Production Management. Foresight Press Ltd Lagos
  12. Bennett I: (1985) Construction Project Management Butterworth's, London.
  13. Bokini S.K. (2005) Skill Acquisition and Development for Craftsmen and Artisans; The Professional Builder NIOB Journal, pp 100.
  14. Chitkara. KK: (2006) Construction Project Management New Delhi, Tata.
  15. Chudley R., &Greeno R. (2005), Construction Technology 6th edition, Pearson and Longman, USA.
  16. Chukwuji Christian F.M (2012): factors affecting production and quality in construction industry Unpublished M.Sc. thesis, Department of Civil Engineering Postgraduate School University of Nigeria Nsukka.
  17. Enshassi, A., Mohamed, S., Mustapha, ZA and Mayer, PE (2007). Factors affecting labour productivity in building projects in Gaza Strip, Journal of Civil Engineering and Management,13 (4): 245–254.
  18. Fagbele, O.I, Ogunde, A.O and Owolabi J.D (2011): Factors Affecting the Performance of Labour in Nigerian Construction Sites. Mediterranean Journal of Social Sciences Rome, Italy 2(2): 251- 7.
  19. Fryer, B. (1990). Human Performance (4th). Great Britain. Blackwell Publisherss.
  20. Gide, A. (2011), Determination of Labour outputs for selected trades in the Nigerian construction industry. Unpublished B.Sc. thesis, Department of Quantity Surveying, A.B.U., Zaria.
  21. Harris F&MacCffer R. (2001) Modern Construction Granada, London.
  22. Horman, J.M. and Kenley, R. (2003). Quantity Levels of Wasted Time in Construction with Meta-analysis, New Zealand.
  23. Jeremiah P. (2012). National Productivity Data. An FRCN Documentary Report
  24. Muhammad, A. (2009) Empirical Determination of Labour Outputs for Selected Trades in Kaduna State, Unpublished B.Sc. Thesis, Department of Quantity Surveying, Faculty of Environmental Design, ABU, Zaria.
  25. Nalumansi, J.,andMwesige G. (2012): Determining Productivity of Masons for both Stretcher and Header Bonding on Building Sites, unpublished B.Sc. dissertation, Department of Building, Makerere University, Kampala. Uganda
  26. NIOB (2005) Nigerian Building Craftsmen Summit Publication.
  27. Nunnally S. W. (1977) Construction Methods And. Management Prentice –Hall, New Jersey.
  28. Nunnaly, S.W. (2005): Construction Method and Mgt., 7th Ed., Blackwell publishing, London.
  29. Obiegbu M. E (2002) Training and Retraining of Craftsmen for NigerianConstruction Industry, The Millennium Challenge, The Professional Builders NIOB, Journal pp 57
  30. Ojo, S.O. (2009). An Identification of Clients' Needs for Building Projects: A Nigerian Study. Ife Journal of Environmental Design and Management, 2 (1): 20- 30.
  31. Olomolaive, P.O., Jayawardane, K.W. and Harris, C.F. (1998). Construction Productivity Management. Edinburgh Gate: Addison Wesley Longman.
  32. Omeata, E C: (2000) Cost and Funding of Training for Engineering personnel; 10th Engineering Assemble, Abuja Nigeria.
  33. Udegbe M I (2005) Labour Force Output on Plastering Activity in Edo State; The Professional Builder, NIOB Journal pp 34.
  34. Wahab K A (1992) Satisfying the Training Needs of Management and Staff in theConstruction Industry Effective Contract Management in the Construction Industry NIOB Journal pp 80.
  35. Wahab KA (1990) Manpower Development and Training for the ConstructionIndustry: The Registered Builders' Journal NIOB PP 14
  36. Yates, J.K. and Guhathakurta, S. (1993). International Labour Productivity in Cost Engineering,Journal of cost estimation, cost/schedule control and project management,35(1), 16-21.
  37. Yu, J. and Lee, H. (2008), Productivity management system for construction projects, Journal of the Architectural Institute of Korea, Vol. 18(7): 103- 13.
How to Cite

A, Y., H, D., & J, J. (2020). AN ASSESSMENT OF CRITICAL FACTORS INFLUENCING PRODUCTIVITY OF CRAFTSMEN ON CONSTRUCTION SITES IN KADUNA METROPOLIS.. Kaduna State University Environmental Sciences Journal, 1(2), 38-48. https://doi.org/10.66884/kesj.2020.dtutsvib

Y. A, D. H, and J. J, "AN ASSESSMENT OF CRITICAL FACTORS INFLUENCING PRODUCTIVITY OF CRAFTSMEN ON CONSTRUCTION SITES IN KADUNA METROPOLIS.," Kaduna State University Environmental Sciences Journal, vol. 1, no. 2, pp. 38-48, December 2020. doi: 10.66884/kesj.2020.dtutsvib

Share this article:
Facebook X / Twitter LinkedIn