Research Article

ENHANCING COST ADVICE OF PUBLIC SECTOR CLIENT ORGANISATIONS BY FORMALISING BUILDING PRICE FORECASTING PROCESS

1 Department of Quantity Surveying, Faculty of Environmental Sciences, Kaduna State University, Kafanchan Campus
2 Department of Quantity Surveying, Ahmadu Bello University, Nigeria
3 Department of Architecture Faculty of Architecture Kaduna State University, Kaduna State, Nigeria
* Corresponding author: yakubuzaki2@yahoo.com
Published: Dec, 2021
Pages: 151-162
Views: 52
Downloads: 22

Abstract

Public sector procurement laws require that building price forecast be established in-house atconstruction project initiation. This has often posed problems of performance most times due topoor budgeting (causing building projects cost and time overruns) for proposed projectsespecially public funded projects. Thus, Building Price Forecasting (BPF),which is the basicfor cost advicethat public client organisations use as budget for assessing building projectsfunds from government is of significant importance within the context of organisationalmanagement and performance. Organisation management theory state that the outcome oforganisations is influenced by behaviours inherent in organisations. Hence, attempts atimproving building price forecasting in public client organisations would require anunderstanding of the effect of the behaviours therein. Exploring Organisational Behaviour(OB) model, this paper presents and discusses theoretical conceptions for understanding BPFprocess within public sector client organisations with a view to improving and formalising theprocess. The model conceptualises building price forecasting at the three levels of anorganisation i.e. individual, group and organisation within the 'input-process-output'framework. For the required data,expert survey and focus group discussion were conductedbased on the outcome of a literature review which gave insights to the likely steps required for aformalised BPF process.40questionnairewere distributed to professionals in 40 firms both inKaduna and Abuja, descriptive and inferential analysis was used to analyse their responses.Toappraise potential influences of organisational behaviours on BPFprocess,70questionnairewere distributed to participants of BPF production units in six UniversitiesandPartial least square – structural equation modelling(PLS – SEM) was used to analyse therelationships and the influences. The study found that organisationalbehaviours interactionswith one another do influenced an individual task performance, which ultimately affects theoutcome. The study also found that there is no formalised and documentedBPF process,therefore, the study recommends that public client organisations shouldadopt the formalisedprocess established herein and ensure the policy of forming teams for the purpose of BPFformulation in order to enhance the performance of the BPF.

References

  1. Ashworth, A., (2013).Cost Studies of Buildings, Longman, London, 5th Ed
  2. Ashworth, A., (2015).Cost Studies of Buildings, Longman, London, 6th Ed
  3. Bayram, S., Öcal, M. E., Laptalı Oral, E., and Atiş, C. D. (2015). “Comparison of multi-layer perceptron (MLP) and radial basis function (RBF) for construction cost estimation: The case of Turkey.”Journal of Civil Engineering Management, 21 (2).
  4. Bayram, S., Al-Jibouri, S. (2016).Efficacy of estimation Methods in Forecasting Building Projects Costs.Journal of Construction Engineering and Management, 142(2)
  5. Boakye, E. O. (2015). The Impact of Teamwork on Employee's Performance. Journal of Project Management,3(5).
  6. Cooke, B. (2015). Management of Construction Projects. Wiley Blackwell, Uk.
  7. Donald, J. F. (2012).An Appraisal of the Causes of delayed Payments in Public Construction Projects in Nigeria. Construction Perspective Focus Journal, Namoda, 10(1).
  8. Erdiş, E. (2013). “The effect of current public procurement law on duration and cost of Construction projects in Turkey.” Journal of Civil Engineering Management, 19(1), 121–135.
  9. Essa,R. and Fortune, c. (2009). Project Price Forecasting and the Evaluation of Housing Association Projects for Sustainable Benefit.School of the Built Environment, Heriot Watt University, Edinburgh.
  10. Eythorsdottir, E. O. (2012). “Reference class forecasting method used in Icelandic transportation infrastructure projects.” Reykjavík Univ., Reykjavík, Iceland.
  11. Flyvbjerg, B. (2011). “Over budget, over time, over and over again managing major projects.” Oxford handbook of project management, P.W.Morris, J. K. Pinto, and J. Söderlund, eds., Oxford University Press,U.K., 321–344.
  12. Fortune,C and Cox (2005). Current practices in building project contract price forecasting in the UK, Paper in print Engineering, Construction and Architectural Management
  13. Fortune, C. J. (2007). Process Standardisation and the Impact of Professional Judgement on the Formulation of Building Project Budget Price Advice.Construction Management and Economics, 124(10)
  14. Kirkham R. J. (2015).Ferry and Brandon's Cost Planning of Buildings. John Wiley & Sons, West Sussex, UK.
  15. Mullins, L. J. (2010).Management & Organisational Behavior. Pearson Education Inc. New York.
  16. Office of Government Commerce (2007). Achieving Excellence in Construction
  17. Potts, K. (2013). Construction Cost Management: Learning from case studies. Taylor & Francis, Abingdon, Oxon.
  18. Quick, J. C. and Nelson, D. L. (2012). Principles of Organisational Behaviour: Realities and Challenges.South-western Cengeges Learning.
  19. Raftery, J.J. (1993). Forecasting and decision making in the presence of risk and uncertainty, Keynote Address to the crB W55 International Symposium on Economic Evaluation and the Built Environment, Lisbon, 6(1) 1-11.
  20. Robbins, S. P., Judge, T. A. (2013). Organisational Behavior. Pearson Education Inc. New Jersey.
  21. Royal Institute of Chartered Surveyors (2013). London
  22. Royal Institute of Chartered Surveyors (2015). London
  23. Skitmore, R.M. (2009).Early stage construction price forecasting - A review of performance, RICS Occasional Paper Series, London
  24. Tanner, R. (2014). Organisational Change: 8 Reasons Why People Resist Change.
  25. TETFUND (2017).Guidelines for Accessing TETFund Intervention Funds.
  26. Walker, A. (2015). Organisational Behaviour in Construction.John Wiley and Sons Ltd. Chicester UK.
  27. Williams, D. and Bert, Z. (2016).Improving Cost Estimating for Greater Performances in the Construction Industry. Construction Perspective Focus Journal,Namoda, Vol. 13(2).
  28. Zaki, Y. M.; Musa-Haddary, Y. G.; Kolo, B. A. Abdullahi, I. (2019).Understanding Building Price Forecasting Based on Organisational Behaviours: Proceedings of the West Africa Built Environment Research Conference 5th – 7th August, GAAS Accra, Ghana.
  29. Zang, R., Ashuri, B., Shyl, Y. and Deng, Y. (2017). Forecasting Construction Cost Index based on Visibility Graph: A Network Approach, Physica A: Statistical mechanics and its Application vol. 493, No. 3.
How to Cite

Zaki, Y. M., Kolo, B. A., Musa-Haddary, Y. G., & OJOBO, H. (2021). ENHANCING COST ADVICE OF PUBLIC SECTOR CLIENT ORGANISATIONS BY FORMALISING BUILDING PRICE FORECASTING PROCESS. Kaduna State University Environmental Sciences Journal, 2(2), 151-162. https://doi.org/10.66884/kesj.2021.ugziwwh0

Y. M. Zaki, B. A. Kolo, Y. G. Musa-Haddary, and H. OJOBO, "ENHANCING COST ADVICE OF PUBLIC SECTOR CLIENT ORGANISATIONS BY FORMALISING BUILDING PRICE FORECASTING PROCESS," Kaduna State University Environmental Sciences Journal, vol. 2, no. 2, pp. 151-162, December 2021. doi: 10.66884/kesj.2021.ugziwwh0

Share this article:
Facebook X / Twitter LinkedIn